Our subsea rock installation vessels feature a cargo capacity of 17,500 metric tonnes, dynamic positioning (DP2), and the ability to operate on marine gas oil (MGO) and/or methanol, providing a pathway to zero-emission operations. Purpose-built for optimal flexibility, our vessels will deliver efficient and cost-effective subsea rock installation services in water depths up to 100 meters.
Currently under construction, the first vessel is expected to begin operations in mid-December 2026, with the second to follow in beginning February 2027.
Our vessels combine advanced technology with operational flexibility to deliver highly efficient, cost-effective and seamless subsea rock installation.
Technical Details
Performance and Efficiency
Rock Installation Capabilities
To download the specs, kindly provide your contact information.